Monday, 25 March 2013

Panama to Galapagos

Hauled out in Flamenco Marina



Barnacles and hairy growths on the hull.


John sanding the hull again



We were taken off Sara Jane and returned to her by boat

After 3 days on the hard in Flamenco marina, surrounded by sport fishing boats and restaurants, we launched once more with a clean and re-painted hull.  A day with a taxi got our laundry and last food shopping done and the last pieces needed for the water-maker installation.   On the 26th February we left La Playita anchorage and  sailed off to the Islas Perlas.  They are in the gulf of Panama and the ‘Survivor’ TV programme was filmed on the island of  Chapera there (we were lulled to sleep by the humming of the generator for the navy base at the end of the island – so they weren’t entirely alone!).

The islands are home to thousands of frigate birds, pelicans and cormorants

All the insects are huge - several of these grasshoppers landed on board at night, attracted by the anchor light - the blade it's on is 6 inches across

After a couple of days we caught up with Chaotic Harmony and enjoyed spending time with friends – Harry had a sleepover with his friend, Gill, on board and they talked all night!   We were sad to see them sail for French Polynesia and look forward to catching up with them there. 

Fitting all the watermaker parts into a small locker is a 3D puzzle

 John spent several days finishing off the water-maker and Yay!  We can make 75 litres of fresh water an hour from sea-water, no more rationing (as long as we have diesel for the generator that powers it) and in celebration I did some laundry!  














We met David and Gitte from Scotland & Denmark on Aros Mear, who are on their way back from Mexico.  We made friends quickly with them, enjoyed their company and are sorry they are headed back through the canal.  They bought their boat from a man who left everything on board and they are now selling off all the things they don’t want.  We bought a great ocean kayak from them to replace Harry’s inflatable kayak that we had just got rid of – very lucky for us.

Exploring ashore in the Islas Perlas

Once the water-maker was up and running, the water tanks full and the washing dried we set off in the early morning on the 9th March to sail to the Galapagos Islands, over 800 miles away. 

Early morning farewell to the Islas Perlas

Harry started to do watches immediately and on his first night, with John, they saw a red distress flare and altered course to investigate.  When they arrived at the scene there were other, bigger vessels there ready to help, so they got back on course.  

After the first night Harry did his own night watch from 11pm – 1am and an afternoon watch as well.  This meant that we all got more sleep and made the crossing far easier. 








The seabirds appreciated the ocean forest




On day 3 we hit the doldrums and ran out of wind completely so we drifted along seeing the occasional log float by and watching the seabirds fishing.  Soon the occasional log turned into hundreds and hundreds of bits of floating forest – all gathered in the same place by the tide, currents and winds & covering at least 2 square miles.  

We had to fend off some big logs that tried to wedge around the bow and were glad to be going through here in daylight. 





Each morning we tuned into the Pacific radio net on the SSB to report our position and to get weather reports - and so kept in touch with Chaotic Harmony and other boats setting off across the Pacific.  It was good to have Eric & Dee on Sirena of Oare just 30 miles away as we paced each other all the way and we are now anchored near each other.  

School, bread-making, fishing and dolphin watching filled the days and the nights were mainly overcast and very, very dark.  One night we had thousands of bioluminescent blobs, like pale green lightbulbs being switched on & off under a black veil of ocean, as far as we could see.  Some were several metres across (shoals of fish?) but most much smaller than that (jellyfish?).  It was very eerie with just a light wind as we sailed slowly along, the sky overcast so just a faint difference in blackness to define the horizon, and surrounded by strange, moving, glowing shapes.




When the wind picked up it was not the expected NE’ly trade winds but came from the south-west, the direction we were headed.  It eventually veered to the south and we sailed, still slowly, the rest of the way.  On the 16th March, at the longitude of 88 35 west, we crossed the equator, poured a libation of champagne into the ocean to thank Neptune, and returned the little mermaid that graced our beautiful farewell cake, made by Hilary Butler, to the deep.






















We anchored off ‘Chatham Island’,(San Cristobal is the Spanish name), on Sunday 17th with sealions diving and playing around us.  Good to see many familiar boats including Irie with Mark and Lisbet, who we last saw in early December.  



Friday, 22 February 2013

Panama Canal


If you missed the tiny dot that was us going through the Gatun Locks then have a look at the great video Phil Swallow made!


The canal transit was a whirlwind of activity – exciting, exhausting and fascinating.  


We headed out to anchor at ‘the flats’ in the bay at 2pm, with our extra crew, Charlotte, Anne & Marcus all aboard.  
Farewell Shelter Bay, Fort Sherman





And out across the anchorage








 We anchored with a few other boats just after 3pm.  Once the kettle was on for tea John looked round to see the pilot boat approaching!  




Kettle off, all hands to jobs and our pilot, Francisco, took charge, we weighed anchor and quickly headed for the Gatun locks.  In the approaches to the locks we tied alongside 2 other boats –the one in the middle had bow–thrusters and Moonbeam was on the starboard side of her.  






A huge variety of ships transit the canal every day

Approaching our 'raft'

Once we were rafted up we waited for the ship ahead of us to stop in the first lock before we moved in.  Mr ‘bow-thruster’ seemed to think that the pilots were superfluous to requirements and kept ignoring instructions to the point where two of them were shouting at him to STOP the engine.  As his bow-thruster technique nearly caused us to hit the wall with our stern we did not appreciate then being told by him that we too should ignore the pilot’s instructions!  
The line handlers ashore threw their heaving lines to us, we tied them to our long ropes (over 125 feet long) and they walked along the lock to position us astern of the ship.







The line handlers are a long way up!

Gates closing in the first chamber 

  Once all 4 ropes were tight and the lock gates closed the water came in at a tremendous rate forming whirlpools and eddies and the 4 line handlers on our ‘raft’ had to work hard to keep the boats central in the chamber. 
 Marcus keeping an eye on our position in the lock while he tends the sternline

 A group of pelicans taking advantage of the turbulence that brings up fish




Francisco spent a lot of time on his phone!



Looking back from the second chamber - the ship you can see is also on the you tube video



 Each lock chamber is 110 feet wide and 1000 feet long – and ships are raised 84 feet from Atlantic/Caribbean sea level to the Gatun Lake.  When the canal was completed the Gatun Dam was the largest earthwork dam in the world, the lake the largest man-made lake and the locks were the largest concrete structures in the world for many years.  At the moment the canal is being widened & a third set of locks, larger than the current ones, are being constructed.


 The crew on the ships were taking photos of us too






The linesmen run up the stairs with the heaving line to the next chamber

Ships are attached by wire ropes to 6 'mules' which tow them along





'Mule'.  On my first transit of the canal in 1975 the crew tried to convince me that it was a cadet's job to get carrots from the galley for the mules ...







The routine of waiting for the ship to be safely stopped in the next lock before we moved was repeated for the 3 locks with us having to haul in our ropes but keeping them attached to the heaving lines, as we moved to the next lock, being lifted up to the level of the Gatun lake.   


As we left the locks the lights were lit ready for the night shift

Once we were clear of the locks we untied from each other with some relief -  and motored into the lake to tie up alongside a large mooring buoy where the pilot boat was waiting to take the pilots home. 

  I had prepared a lasagne & salad for supper so we were able to relax in the cockpit for a while, all relieved that the first part had gone smoothly.  Francisco said the pilot would arrive around 6.30am so we got up at 5.30, anticipating watching the sun rise with a mug of tea, and the pilot boat turned up soon after 6am on my birthday!  The pilot was also called Francisco and he too was helpful and informative. 



Francisco 2 watching Marcus letting us go from the mooring buoy 




 Before sunrise on my birthday & getting ready to cook bacon and eggs for everybody

Anne & Charlotte enjoying the sunrise over Gatun Lake



Off we went across the huge lake, past many hill-tops that are now islands and then through the toughest part of the canal construction, the 14km Galliard cut which leads to the Pacific side locks.


Even after 100 years the islands look strange, and there are dead trees still standing in the water





Birthday cake for morning break




Anne got lots of useful tips from Francisco on bringing their boat, Flow, through the canal 






We all took turns at steering the boat







Charlotte modelling John's new tilley hat

Many ships have been converted to do different jobs in the canal expansion






  Part of the Galliard cut












We had to slow down near the Pedro Miguel lock and wait for ships to go through before we rafted up to a British catamaran, Juffa, and entered the lock behind 3 other yachts, a tour boat and a large motor yacht.   







Going down 30 feet was much more peaceful than going up and once we were at the level of the Miraflores lake (man-made) we remained rafted up to Juffa as we motored across the lake to tie up in the first chamber (of 2) at the Miraflores locks.  






Our lovely crew relaxing between locks








There is a large visitor centre here which was packed with people waving to us as we waved to the cameras in the hope that some of you would see us – and amazingly some of you did.  



Miraflores Locks















The Miraflores visitor centre















The Miraflores lock gates are the highest of all as the tidal range in the Pacific is about 16 feet.  Once we were through and had separated from the raft it was a quick lunch for the pilot before he left us near the gateway to the Pacific Ocean, the Bridge of the Americas. 


Approaching the Bridge of the Americas and the Pacific Ocean at last

 I had prepared Chicken Marbella (cooked on Saturday morning), potato salad and salad – once Francisco was safely back on the pilot boat we all ate as we motored towards Balboa where we said goodbye to Anne & Marcus who were great crew.







Anne & Marcus getting a lift ashore


Steering us into the Pacific

We motored over to one of the holiday islands in the bay, anchored and all jumped in for a swim – it was freezing!  At least 10 degrees colder than the bath-like sea on the Caribbean side.  The bad news was that it was clear enough to see the hull and it was covered in barnacles & weird hairy growths – totally unexpected after all anti-fouling paint put on in shelter Bay, which we now know was rubbish.
Off to the beach

So after a lovely few days with Charlotte aboard we are now hauled out again, have scraped a vast number of barnacles off the hull, repainted it and plan to launch today.  We are doing our last 'big shop' tomorrow then heading off to the Islas Perlas on Monday.  A few days there then we sail to the Glapagos.

 Being towed back by Oscar from Banana.  We have met up with lots of friends here and will keep in touch as we all cross the Pacific.